Cherry Street Sewer Upgrade RFP
Posted
Oct 13, 2026
Nov 13, 2026
The new sewer line is proposed divert flow around the cell tower and its footprint. There will be an additional 2 new manholes. The project will also replace 1 existing manhole, and approx. 82 LF of existing sewer piping. All new pipe will match the existing piping and will be 8" dip. The project will utilize 60 LF of existing 14" casing to install the new 8" piping at the existing railroad tracks.