S.P. 067-608-017 RFP
Posted
Sep 25, 2026
Oct 19, 2026
The Major Quantities of Work are: 64 Cu. Yds. Structural Concrete; 1,882 Sq. Ft. of Bridge Slab Concrete; 22,700 Pounds of Reinforcement bars (Epoxy Coated); 210 Cu. Yds. Random Rip Rap (Class III); 280 Lin. Ft. Steel H-Piling 10”; 2-10” Steel H-Test Piles 40 Ft.
