Open RFPConstructing the Lighting Rehabilitation RFP
Description: Work includes 800 SY filter blanket, geotextile, 3 Acre seeding, 3 Acre mulching, 9 Ton temporary mulching, 1,000 EA sand bags, 6,000 LF wattle, 20", geometric controls, construction fuel, 2 EA truck mounted impact attenuator unit, 3,162 SF construction signs, 1,000 EA channelizing drums, 4 EA portable sequential arrow and chevron sign unit, 2 EA portable changeable message sign, type 2, roadway luminaire assembly with one, led low profile underpass surface mount, 150 watt equivalent luminaire 42 EA, 266 EA roadway luminaire assembly with one, led, 400 watt equivalent luminaire. See attached file.