Auburn University At Montgomery
Higher EducationAL
Posted
Sep 20, 2026
Nov 5, 2026
AUM Moore Hall Partial Interior Renovation RFP
Partial Interior Renovation.
Description: Project consists of demolition of existing structures, relocation of utilities, installation of new infrastructure, and construction of new facilities. Specific tasks include demolition, concrete, masonry, metal wall panels, roofing, doors, hardware, storefront, curtain wall, framing, drywall, stucco, acoustical ceilings, flooring, painting, specialties, signage, athletic field construction, elevator, fire suppression, plumbing, hvac, electrical, low voltage, fire alarm, sitework, utilities, and landscaping.
City · FL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
Auburn University At Montgomery
Higher EducationAL
Posted
Sep 20, 2026
Nov 5, 2026
Partial Interior Renovation.
School DistrictAL
Posted
Oct 8, 2026
Oct 27, 2026
In general, the project shall consist of selective demolition and new construction including, but not limited to: Site work, renovation of an existing concrete block wall construction building adding new brick veneer, new shingle roofing, and interior concrete block wall and paint finish, acoustical tile ceiling, hard tile flooring, vinyl and epoxy floor finishes, kitchen hood, plus plumbing, mechanical and electrical work as required to perform the work under this Contract.
Higher EducationMN
Posted
Sep 25, 2026
Oct 15, 2026
Project consists of an interior remodel of an existing instruction plastics lab into a modern instructional robotics lab and classroom. The project includes approximately 6,600 gross square feet located on the first floor at technical college's. The work will include, but is not limited to: minor demolition work includes selective demolition of partial walls, a paint booth and supporting ductwork, cooling, and sprinkler piping, replacement of an existing sink with a multi-station wash fountain, as well as light fixture relocation, cabling removal, panel and device removal. Minor construction work includes partial walls and a ‘lid’ to create a larger sound isolated instructional classroom space with acoustically treated walls and ceiling, interior doors, interior windows, frames, hardware, wire mesh partitions, and finishes. HVAC support for the classroom, infill of an existing trench drain, sprinkler piping modifications and additions, and electrical power, lighting, and device layout modifications to support the revised layout and function of the lab and classroom spaces. Refer to the construction drawings for full extents of demolition, relocation, and new work.
CountyNM
Posted
Jul 20, 2026
Oct 20, 2026
A 2-story building addition and renovating a portion of the existing building. The existing building houses the 13th District Courts for the State of NM and will remain in use during construction. The north portion of the existing building will be completely remodeled including structural enhancements to support new bldg systems being installed. The addition will be a steel framed building on concrete grade beams supported by spread footings on rammed aggregate piers. The addition includes Magistrate Courts on the first level and District Courts on the second level and associated security functions. The Site work includes developing the vacant land on the east and preparation work for new NMDOT access points. and other Work indicated in the Contract Documents.
Decision makers connected to this RFP from City of Clearwater.